top of page

RECENT WORK
WASTE AND WASTEWATER TREATMENT

DUQM INTEGRATED POWER AND WATER PROJECT (DIPWP)
CONTRACT NO: DPC/C010/2018

DUQM POWER COMPANY LLC, JV BETWEEN THE CENTRAL UTILITIES COMPANY (MARAFIQ) AND GULF PACIFIC HOLDING COMPANY

Main contractor: 

ALGHANIM COBRA TEDAGUA SOJITZ WATER AND POWER LLC

SUB-CONSULTANT (DEPUTY PROJECT DIRECTOR)

DUQM-L2.jpg

2019

The project’s scope of work consists of a natural gas-fired 300 MW combined cycle power plant integrated with a 1,500 cubic meters per hour seawater reverse osmosis (RO) desalination plant located at Duqm Special Economic Zone, Duqm, Al Wusta, Oman. The project includes a marine intake structure, seawater pumping station, seawater supply, return channels and beach well system.​

MANDALAY URBAN SERVICES IMPROVEMENT PROJECT (MUSIP)
PROJECT ID: AIF-17
MANDALAY CITY DEVELOPMENT COMMITTEE (MCDC)

SUB-CONSULTANT (CIVIL ENGINEERING EXPERT)

2019

Project activities are divided into three parts which are defined as follows:
Raw water intake capacity 2.000 m3/h with transmission main DN600, 1.700 m1 to WTP, Water Treatment Plant (WTP), rapid sand filter process, capacity of 2.000 m3/h, Pumping station, transmission main DN800, 5.600 m1 to existing water reservoir on Mandalay Hill including remediation work on the reservoir itself.
The project aims to provide a reliable and sustainable public water service in Mandalay. The project, which results from a feasibility study is co-financed by the Asian Development Bank (ADB) and the Agence Française de Développement (AFD).

PREVIOUS WORK

WASTE AND WASTEWATER TREATMENT

CLIMATE CHANGE MITIGATION MEASURES IN THE WASTEWATER SECTOR IN JORDAN IMPLEMENTATION OF PRIORITIZED INVESTMENT MEASURES FOR THE IMPROVEMENT OF SLUDGE TREATMENT AND DISPOSAL IN JORDAN, PHASE 2: DESIGN, TENDERING SUPPORT, AND "CONSTRUCTION SUPERVISION AND OPERATIONS MANAGEMENT OF SELECTED WWTP'S;" TENDER NO. 21/2017/SW
MINISTRY OF WATER AND IRRIGATION
WATER AUTHORITY OF JORDAN
SUB-CONSULTANT

2018

Project activities are divided into three parts which are defined as follows:

• Part 1: As-Samra Mono Landfill Construction
• Part 2: Wadi Al Arab and Irbid Central WWTPs
• Part 3: Final Treatment Station
The first investment will be in Part 1 to construct Mono Landfill in As-Samra WWTP followed by Part 2; fetching upgrade of existing Central Irbid and Wadi Al Arab WWTP in order to improve the sludge treatment and disposal along with increasing the quality of effluent. Part 3 will present the last stage of investment and will fetch the Final Treatment Station (FTS) to increase the quality of the effluent to satisfy agricultural use standards. Aspekt plus d.o.o. rendered its services in the field of Project inception and 
Project Management including Contract and Claim management.

LOT I: CONSTRUCTION OF KIU & DANDORA ESTATE TRUNK SEWERS AND EXPANSION OF DANDORA WASTEWATER TREATMENT PLANT

CHIEF EXECUTIVE OFFICER, ATHI WATER SERVICES BOARD      

(AWSB)

SUB-CONSULTANT

2012

Foul Sewerage pipeline; dia 300 mm, 11,2 km; dia 500 mm, 6,3 km
dia 600 mm, 21,2 km, dia 800 mm, 10,1 km, dia 1100 mm, 1,3 km
Expansion of Wastewater Treatment Plant

PROCESSING UNIT STABILIZING SLUDGE INTO CONSTRUCTION COMPOSITES (BACOM)
CEROD, CENTRE FOR MUNICIPAL WASTE TREATMENT D.O.O.

2012

BACOM is abbreviation for facility treating sludge from municipal waste landfill leachate water by ash and other stabilization additives into stabilized matter suitable for construction use.

bottom of page